Macclenny Demolition Services
Finding a reliable demolition company in Macclenny, Florida that offered fair rates and high quality services used to seem impossible, but with awwaste.com, it’s easier than ever before. Call or request a quote to get estimates on:
- Commercial Demolition in Macclenny, Florida
- Residential Demolition in Macclenny, FL
- Swimming Pool Removal in Macclenny, Florida
- Concrete Demolition in Macclenny, FL
- House Demolition in Macclenny, Florida
You won’t find better demolition contractors in Macclenny, Florida anywhere else
(a)
Building permit fee charges and valuation on construction for determination of permit fees shall be as follows:
(1)
Valuation on construction: Fee
Commercial buildings, per square foot …..$50.00
Heated living area, per square foot …..30.00
Nonheated living area, per square foot …..25.00
Carports, porches, sheds and Utility buildings, per square Foot …..20.00
Remodel (see fee schedule, subsection (b)), minimum …..50.00
Deck (open), per square foot …..20.00
Open-area farm buildings, per square foot …..3.00
Closed-area farm buildings, per square foot …..5.00
(2)
Roofing:
New construction (see fee schedule, subsection (b)), minimum …..50.00
Existing (see fee schedule, subsection (b)), minimum …..50.00
(3)
Swimming pools:
Construction (see fee schedule, subsection (b)), minimum …..50.00
Pool enclosure (see fee schedule, subsection (b)), minimum …..50.00
Wiring: see electrical permits. …..50.00
(4)
Mobile homes or mobile buildings:
Move-on for trailer parks (singlewide) …..125.00
Move-on for trailer parks (doublewide) …..150.00
Move-on for trailer parks (triplewide) …..175.00
Electrical pole (see electrical permits) …..50.00
(5)
Moving of permanent structures:
Structure less than 1,000 square feet …..125.00
Structure 1,000 square feet To 2,000 square feet …..150.00
(6)
Electrical permits:
Wiring new or separate service …..75.00
Additions and upgrading service …..50.00
Commercial buildings …..100.00
Construction and utility poles …..50.00
Mobile home, complete (wiring pole and trailer) …..50.00
Wiring swimming pool …..50.00
Reinspections …..10.00
(7)
Plumbing permits:
Per fixture …..5.00
Septic tank hookup …..6.00
Water hookup …..6.00
Issuing permit …..10.00
(8)
Mechanical permits: Heating Or air conditioning, each Separate unit …..25.00
Residential …..50.00
Commercial …..100.00
(9)
Reinspections: Each trip …..25.00
(10)
Driveway permits: Each driveway …..20.00
(11)
Fence permits: Each fence …..20.00
(12)
Deep well permits: Each well …..10.00
(13)
Cost of Building 0.00 to 2,000.00 …..25.00
See valuation schedule, subsection (b)
(14)
Site clearing:
Up to ½ acre …..50.00
½ to 1 acre …..75.00
Each additional acre …..25.00
(15)
Culvert …..20.00
(16)
Demolitions …..50.00
(17)
Underground Utilities: Electrical, gas and cable …..100.00
(18)
Site plan review
Up to 1½ acre …..500.00
1½ acre and up …..750.00
Subdivision 1 to 8 Lots …..500.00
Subdivision 9 lots or more …..1,000.00
(19)
Preliminary:
Development fee …..50.00
Final development fee …..100.00
(20)
Planned unit development …..400.00
(21)
Plan review fee:
House plan review …..½ of permit fee
50.00 minimum
Commercial plan review …..½ of permit fee
50.00 minimum
(22)
Late Fee:
Job done before pulling
permit …..Double Fee
(b)
The building permit fee schedule for fees based on valuation of construction shall be as follows:
Valuation | Fee | Schedule |
101.00—1,000.00 | 10.00 | $10.00 for each $1,000.00 or fraction thereof |
1,001.00—2,000.00 | 25.00 | |
_____ | ||
2,001.00 – 3,000.00 | 30.00 | 25.00 for the first $2,000.00, plus $5.00 for each additional $1,000.00 or fraction thereof |
3,001.00 – 4,000.00 | 35.00 | |
4,001.00 – 5,000.00 | 40.00 | |
5,000.00 – 6,000.00 | 45.00 | |
6,000.00 – 7,000.00 | 50.00 | |
7,000.00 – 8,000.00 | 55.00 | |
8,000.00 – 9,000.00 | 60.00 | |
9,000.00 – 10,000.00 | 65.00 | |
10,001.00 – 11,000.00 | 70.00 | |
11,001.00 – 12,000.00 | 75.00 | |
12,001.00 – 13,000.00 | 80.00 | |
13,001.00 – 14,000.00 | 85.00 | |
14,001.00 – 15,000.00 | 90.00 | |
_____ | ||
15,001.00 – 16,000.00 | 95.00 | |
16,001.00 – 17,000.00 | 100.00 | |
17,001.00 – 18,000.00 | 105.00 | |
18,001.00 – 19,000.00 | 110.00 | |
19,001.00 – 20,000.00 | 115.00 | |
20,001.00 – 21,000.00 | 120.00 | |
21,001.00 – 22,000.00 | 125.00 | |
22,001.00 – 23,000.00 | 130.00 | |
23,001.00 – 24,000.00 | 135.00 | |
24,001.00 – 25,000.00 | 140.00 | |
_____ | ||
25,001.00 – 26,000.00 | 144.00 | $4.00 for each additional $1,000.00 |
26,001.00 – 27,000.00 | 148.00 | |
27,001.00 – 28,000.00 | 152.00 | |
28,001.00 – 29,000.00 | 156.00 | |
29,001.00 – 30,000.00 | 160.00 | |
30,001.00 – 31,000.00 | 164.00 | |
31,001.00 – 32,000.00 | 168.00 | |
32,001.00 – 33,000.00 | 172.00 | |
33,001.00 – 34,000.00 | 176.00 | |
34,001.00 – 35,000.00 | 180.00 | |
35,001.00 – 36,000.00 | 184.00 | |
36,001.00 – 37,000.00 | 188.00 | |
37,001.00 – 38,000.00 | 192.00 | |
38,001.00 – 39,000.00 | 196.00 | |
39,001.00 – 40,000.00 | 200.00 | |
40,001.00 – 41,000.00 | 204.00 | |
41,001.00 – 42,000.00 | 208.00 | |
42,001.00 – 43,000.00 | 212.00 | |
43,001.00 – 44,000.00 | 216.00 | |
44,001.00 – 45,000.00 | 220.00 | |
45,001.00 – 46,000.00 | 224.00 | |
46,001.00 – 47,000.00 | 228.00 | |
47,001.00 – 48,000.00 | 232.00 | |
48,001.00 – 49,000.00 | 236.00 | |
49,001.00 – 50,000.00 | 240.00 | |
_____ | ||
50,001.00— 100,000.00 |
$240.00 for the first $50,000.00, plus $3.00 for each additional $1,000.00 or fraction thereof | |
_____ | ||
$100,001.00— 500,000.00 |
$390.00 for the first $100,000.00, plus $2.00 for each additional $1,000.00 or fraction thereof | |
_____ | ||
500,001.00 and up | $1,190.00 for the first $500,000.00, plus $1.50 for each additional $1,000.00 or fraction thereof |
Unverified Macclenny Demolition Contractors
J. Hamner Services, Inc. | |
Ross & Logan Disposal | |
Adam Ant Fill & Clearing | |
Waste Watchers Of Jacksonville | |
A-aable Wrecker Services | |
Mr Trash-house Home Commercial Building Demolition | |
Wayne’s Tree Service | |
Burkhalter Wrecking Inc | |
Lockwood Quality Demolition | |
Main Recycling Co Inc |